SEPAM  was the EPC turn-key contractor for the project. The project had a very demanding schedule which required the design to be carried out in parallel with the construction. This model of project execution is quite unusual in the Irish context and required a very high level of cooperation and trust to be developed between the Servier, Sepam and its specialist sub contractors. This integrated team approach allowed total focus on the goal of production start-up on time on May 1st 2008. This commitment to Servier was met without any compromise on quality of finish or safety.